A quick and simple energy solution
During the planning phase, a simple study was carried out to calculate energy requirements and anticipate the volume of hydrogen needed to power the event. The aim was to provide power to an area off the grid, and in particular to operate a giant screen.
Key Figures
1000kWh
power supply
3 days
of running
161 kg of CO2
avoided
Remplacement of a diesel generator
The ACO entrusted EODev with the replacement of a 50 kVA diesel generator set with a GEH₂ generator set in order to supply electricity to the event’s main Fan Zone.
Silent production and cleaner air
In three days, 161 kg of CO₂ were saved and visitors benefited from an optimal experience through silent electricity production and improved air quality on site. As well as preventing emissions of CO₂, NOx, SOx and other fine particles, the GEH₂ also filters the ambient air and significantly improves the air quality on site.

“We’re looking for innovation partners, so it was natural for us to turn to EODev to invest in hydrogen technology for off-grid electricity.”
Stéphane Darracq, Directeur Général d’ACO