The construction sector has always been a major energy consumer, but the trend is accelerating with the increasing electrification of worksites and the development of electric site machinery. Faced with growing energy requirements, both for powering infrastructure and recharging equipment, EODev offers a complete range of solutions tailored to these specific needs. Used on their own or in parallel, GEH₂ and BESSTIE will be major allies.
Our solutions in action
Roadworks in the heart of Paris
Vinci construction & Loxam power a zero-emission worksite with a GEH₂ in the heart of a residential area. The electro-hydrogen unit helped to power the living quarters and recharge several electric vehicles on site.


An emission free powered construction site
In the heart of a protected Natura 2000 site, three GEH₂ have been paralleled with a battery system to power a worksite and recharge its equipment continuously for 10 days.