Back-up systems for a critical site
At a port, a power cut is never just an inconvenience. Gates, access control, site lighting, pumping systems etc, all have to keep running, whatever happens on the grid. For decades, that guarantee has come from diesel generators, waiting on standby, now time has come to leave the floor to a more sustainable and efficient solution with hydrogen generator.
The ports of La Spezia & Carrara chose to deploy several GEH2 fuel cells power systems.
Italian ports turning green
The Port System Authority of the Eastern Ligurian Sea, wanted to keep a level of reliability of its sites, while taking diesel out of the equation.
Following the Green Ports programme of Italy’s recovery plan, funded by NextGenerationEU to support the energy transition of Italian port infrastructure, they selected EODev’s technology to power their facilities in case of sudden grid break.
Key figures
610 kVA
on standby
Two
ports commissioned
Six
hydrogen generators units
EODev’s largest GEH2 back-up installation to date
Six hydrogen fuel cell generators (GEH2) have been standing guard over the critical systems of the two Ligurian ports, in place of the diesel generators that used to do the job.
Hydrogen generators power supply set-up
Led by BluEnergy Revolution, the project placed four GEH2 units at La Spezia, delivering up to 440 kVA of standby power, and two at Marina di Carrara, delivering up to 220 kVA. Each generator is paired with its own hydrogen bundle, stored in a dedicated area beside the units. Together, they provide 660 kVA of zero-emission backup power, with no exhaust fumes and very little noise on the quayside.
A tailor made installation
Each port adapted its own installation to ensure the GEH2 units and hydrogen storage were seamlessly integrated into the existing infrastructure. To secure access to the site and above all to the hydrogen storage ATEX zone, a dedicated building was constructed to house the gas racks and pressure regulation skids, each connected to its power unit.
- At the Port of Carrara, the GEH2 and electrical cabinets were fenced off to guarantee site security.
- At La Spezia, each of the four hydrogen racks is stored in a dedicated space, equipped with additional detection systems to eliminate any risk of flammability.
How hydrogen takes over when the grid fails
For the electrical teams, the architecture holds no surprises: the integration follows the usual pattern for standby power. A DEIF mains controller in the switchboard monitors the grid and, as soon as it detects an outage, starts the generators.
The first moments are covered by the battery built into each GEH2, which picks up the load straight away. Behind it, the hydrogen side comes to life: the system pressurises, then the fuel cell modules start. From there, each unit can run for several hours on its own hydrogen bundle, until the grid returns.
A collaborative project from A to Z
After leaving EODev’s factory to go straight to Italy, the units have been commissioned by our after-sales team, alongside the BluEnergy crew who led the installation, backed by the Port System Authority of the Eastern Ligurian Sea.
“This is our largest GEH2 back-up installation to date,” says Adrien Dumoux, Technical Support Engineer at EODev. “The BluEnergy team was well prepared and keen to understand the technology. We look forward to the next project together.”
“EODev did not just supply the hydrogen generators,their team shared its expertise, technical support and industrial vision.”
Marco Ferrando, Project Manager at BluEnergy
La Spezia Port custom installation overview
Custom-built facility for hydrogen storage
Building housing the GEH2 Power Generators